Offering innovative solutions that comply with industry regulations and best practices for both large and small aircraft and rotorcraft.
Now part of the KDC Group, ATL Europe has enhanced its capability providing unmatched technical expertise and competitive pricing. We manage the entirety of your certification and approval processes, ensuring compliance with EASA Part 21J, UK MOD DAOS, ISO 9001:2015.
Certifications for Large and small aircraft (CS25 & CS23) and Large and small rotorcraft (CS27 & CS29).
- Primary and Secondary structure change
- Fuselage Penetrations for antennas, etc.
- Passenger to Freighter (P2F) Conversions
- Seating configuration Changes
- Furnishing Changes
- Galley Inserts (Installation and Removal)
- Safety Equipment Changes
- Catering Carts
- Modification or installation of; ADS-B, QAR, IFE, SatComs, Traffic Collision Avoidance System (TCAS), ATC Transponder Upgrades (5G Interference)
- In-seat Power Supplies (USB etc), Cabin LED Lighting
- Wi-Fi Installations
- Special Mission Equipment Installations
- Electrical Load Analysis (ELA), EWIS
- Flight Manual Supplements
Latest Insights
View the latest insights from ATL Europe on industry trends, news and expertise.
March 18, 2025
When we think about saving the environment, it usually comes at an extra cost. We’ve introduced this series of posts to help you to introduce modifications to your aircraft that save money for you as an operator in the long term, without a significant outlay (if you’re already planning on upgrading).
March 18, 2025
The methodology used to estimate the annual fuel cost savings from reducing a typical medium-haul aircraft weight by 1 kg on a medium-haul flight.
February 17, 2025
Under EU Regulations, it is mandated that Hand-Held Halon Fire Extinguishers in cabin & crew compartments need to be replaced by the 31st of December 2025 with non-Halon suitable alternatives.
Trusted by these companies
Testimonials
See what our clients have to say about ATL Europe.
I wanted to say thanks for your work and cooperation on getting our project completed ahead of schedule. You certainly understand the importance of this trial and how it leads to success for the program.
Thank you for your great efforts in this critical moment. I really appreciate you and your team’s dedicated works. Now, we see the goal line, and we are almost close to the end. Please get the high spirit for RFMS, as we all depend on yours
Thanks from myself and the One Air team for all of your hard work producing the modification documents to allow fitment of the seats to our aircraft. The seats are now fully installed on both aircraft and have been well received by the crew and flying engineers/loadmasters.
Frequently Asked Questions
Have a question? Here, you will find the most asked questions from our clients.
Ready to start a conversation?
Building 307,
Aviation Park West,
Bournemouth Airport,
Dorset,
BH23 6NW
ATL Europe,
3 rue Franche Comté,
Pépinière d’Entreprises BP311,
50103 Cherbourg en Cotentin,
France